1. The underground continuous wall is excavated in sections, with high-quality mud wall protection, automatic guidance, inclination measurement and correction, good integrity, flat wall surface and high verticality.
2. According to the thickness of the wall, the corresponding joint form is adopted, and the underwater concrete is poured into the wall, which has strong anti-seepage, shear and bending resistance.
3. It can be constructed close to buildings (structures) to maximize the use of construction land.
4. Equipped with a microcomputer control system, the trenching is highly automated, and the inclination can be measured and corrected as the trench is dug, and the trenching quality is reliable.
5. The construction has a high degree of mechanization, low labor intensity, few construction workers required, and high efficiency.